UK Quantity Surveying · Est. 2014
Bills of quantities &
cost estimates,
delivered by Experts.
We're a UK-based team of chartered estimators. NRM2 / SMM7 compliant. Fixed fees, 48-hour turnaround on takeoffs, and a real human on every job not an AI guessing at your drawings.

What we do
Four services.
One discipline.
Whether you need a full priced BOQ, a budget check or just measured quantities, you're working with the same chartered team end-to-end.
BOQ Preparation
NRM2 / SMM7 compliant bills of quantities, fully measured and itemised, ready for tender.
Cost Estimation
Order-of-cost, elemental, pre-tender and tender estimates benchmarked against live UK rates.
Quantity Takeoffs
Measured quantities from PDFs, DWGs and BIM models. 48-hour turnaround on most packages.
Tender Support
Subcontractor pricing, bid comparisons, query schedules and post-tender clarifications.
Trusted by
UK Contractors & Developers
We've Served.








How it works
From drawings to a priced bill in four steps.
01
Send drawings
Upload PDFs, DWGs or BIM. We sign an NDA on request.
02
Scope & fixed fee
You receive scope, deliverables and a fixed price within 24 hours.
03
We measure
Chartered estimators measure, cross-check, and benchmark rates.
04
Delivery & revisions
Excel BOQ, PDF report, and two rounds of revisions included.

What you receive
A bill you can issue to tender on day one.
- Excel BOQ structured to NRM2 or SMM7 (your preference)
- PDF summary report with assumptions and exclusions
- Backup measurement sheets with drawing references
- Benchmarked rates from current UK market data
- Query schedule and risk register
- Two rounds of revisions included as standard
£2.4B+
of works measured
1,800+
projects delivered
48h
typical takeoff turnaround
92%
client repeat rate
Selected work
Recent projects we've measured & priced.
Total base bid
£1,706,870.57
The White Hart
Comprehensive construction cost estimate for The White Hart, a 2-storey duplex villas development in Marden. Itemised bill of quantities covering everything from concrete foundations and brickwork through to roofing, finishes and full M&E installations.
Open full BOQ (PDF)Total base bid
£132,408.39
24 David Road
Renovation and extension estimate for a residential dwelling at 24 David Road. Includes demolition of existing walls, roof structure and finishes, new dormer with pitched roof, and a flat-roof extension with fibreglass finish.
Open full BOQ (PDF)In their words
Trusted by contractors and consultancies across the UK.
"TakeOff Technology turned around our pre-tender estimate in 36 hours. The benchmarking was spot on within 2% of the returned tenders."
"Their BOQs are the cleanest I've worked with. Everything cross-references back to the drawings query schedules are almost empty."
"We use them as an extension of our team. Fixed fees, no surprises, and the deliverables are tender-ready."
Next step
Send us your drawings.
Get a quote in 24 hours.
Upload PDFs, DWGs or BIM models. We'll come back with scope, fixed fee and turnaround.
Request a quote